<td id="kg486"><optgroup id="kg486"></optgroup></td>
<button id="kg486"><tbody id="kg486"></tbody></button>
<li id="kg486"><dl id="kg486"></dl></li>
  • <dl id="kg486"></dl>
  • <code id="kg486"><tr id="kg486"></tr></code>
  • Swimming robot to probe damage at Japan nuclear plant

    Jun 16, 2017

    A Japanese industrial group unveiled a swimming robot June 15 designed for underwater probes of damage from meltdowns at the Fukushima Dai-Ichi nuclear plant after the March 2011 earthquake and tsunami.

    Remote controlled robots are key to the decades-long decommissioning process for the plant. But super-high radiation and structural damage inside the reactors hampered earlier attempts to inspect areas close to the reactors’ cores.

    The developers say they plan to send the probe into the primary containment vessel of Unit 3 at Fukushima in July to study the extent of damage and locate parts of melted fuel thought to have fallen to the bottom of the chamber, submerged by highly radioactive water.

    The robot, nicknamed the “mini manbo,” or little sunfish, is about the size of a loaf of bread. It is equipped with lights, manoeuvrs with tail propellers and collects data using two cameras and a dosimeter.

    During Thursday’s demonstration at a test facility near Tokyo, the probe slowly slid down from a rail and moved across the water. A team operated it remotely, with one guiding the robot while another adjusted a cable that transmits data and serves as its lifeline. The probe entered a mock-up of a containment vessel, its lights glowing in the murky water.

    Officials hope the probe can swim deep into the reactor to illuminate the area underneath the reactor’s core.

    Japan hopes to locate and start removing fuel from the reactors after Tokyo’s 2020 Olympics.

    Earlier, snake and scorpion-shaped robots became stuck inside two reactors. The scorpion robot’s crawling function failed and it was left inside the plant’s Unit 2 containment vessel. The other, designed for cleaning debris for the “scorpion” probe, was called back after two hours when two of its cameras stopped working after its total radiation exposure reached 1,000 Sievert—a level that would kill a human within seconds. The plan had been to use the robot for 10 hours at an exposure level of 100 Sievert per hour.

    The swimming robot shown was co-developed by electronics and energy giant Toshiba and the government’s International Research Institute for Nuclear Decommissioning.

    Scientists need to know the melted nuclear fuel’s exact location and understand structural damage in each of the three wrecked reactors to work out the optimum, safest way to remove the fuel.

    “The fuel debris will be a challenge,” said Dale Klein, a former U.S. Nuclear Regulatory Commission chief, who now serves as an outside adviser to the Tokyo Electric Power Co., the plant’s operator. He said it could take six months to a year to obtain necessary data and decide on how to remove the fuel.

    “They will have to identify where it is, then they will have to develop capability to remove it. No one in the world has ever had to remove material like this before. So this is something new and it would have to be done carefully and accurately,” Klein said.

    Japanese officials say they want to determine preliminary removal methods this summer and start work in 2021. The decommissioning technology developers IRID and its partners have designed other basic robots, including a “muscle” arm robot made by Hitachi-GE Nuclear Energy, and a different arm robot made by Mitsubishi Heavy Industries, that are designed to approach the debris from the sides of the reactors.

    TEPCO is struggling with the plant’s decommissioning, which is now expected to cost 8 trillion yen ($70 billion), four times an earlier estimate. Part of that cost will be included in Japanese utility bills.

    The 2011 meltdown forced tens of thousands of nearby residents to evacuate their homes. Many are still unable to return due to high radiation levels.

     

    Source: Canadianmanufacturing.com


    Copyright ? 2017, G.T. Internet Information Co.,Ltd. All Rights Reserved.
    主站蜘蛛池模板: 四虎影8818| 国产-第1页-浮力影院| wwwxxx在线观看| 日韩色在线观看| 低头看我是怎么c哭你的细节| 高清毛片免费看| 在线看无码的免费网站| 丰满少妇好紧多水视频| 欧美在线xxx| 免费大香伊蕉在人线国产| 香瓜七兄弟第二季| 国产高清一级伦理| 一级毛片特级毛片黄毛片| 最新版天堂中文在线官网| 亚洲视频一区二区三区四区| 荫蒂添的好舒服视频囗交| 国产精品久久久久影视不卡| 一本一本久久a久久精品综合| 日韩中文字幕不卡| 亚洲春黄在线观看| 窝窝午夜看片成人精品| 国产传媒一区二区三区呀| 羞羞漫画成人在线| 天天天天天天天操| 中文字幕久热精品视频在线| 最好看的免费观看视频| 亚洲欧美中文字幕在线网站| 精品国产v无码大片在线看| 国产偷亚洲偷欧美偷精品| 男人资源在线观看| 大桥久未无码吹潮在线观看| 中文字幕不卡免费高清视频| 日韩精品一区二区三区在线观看| 亚洲欧美在线看| 男女一边摸一边做爽视频| 国产91精品一区| 麻豆视频传媒二区| 国产精品久久久久一区二区三区 | 国产一区二区三区在线观看影院 | 男女肉粗暴进来动态图| 国产jizzjizz视频全部免费|